Energy QLD | Barcaldine Depot Concrete Pavement Replacement & Pole Yard Extension
Client: Energy Queensland Limited
Energy QLD | Barcaldine Depot Concrete Pavement Replacement & Pole Yard Extension
Pentacon was principal contractor & scope of work was to replace the existing pavement with new reinforced concrete pavement, and construct pole storage at Barcaldine Depot.
- Site management, community liaison, environmental and erosion management, safety and quality management, traffic management 
- Removal of existing concrete hardstand, asphalt seal and pavement, extruded kerbs and inverts, linemarking 
- Earthworks 
- Roadworks including trimming and compacting subgrade to pavement, placement of geofabric 
- Asphalt works 
- Construction of 1,250m2 at 200mm thick concrete hardstand, including staged construction phasing to suit clients requirements in maintaining a fully operational site 
- Linemarking 
- Installation of signage and concrete wheel stops 
- Turfing 
 
                        