DTMR | Gore Highway 28A (Toowoomba - Millmerran)
Client: Department of Transport & Main Roads
DTMR | Gore Highway 28A (Toowoomba - Millmerran)
Pentacon is the principal contractor for the construction of pavement stabilisation and sealing works at Gore Highway 28A (Toowoomba - Millmerran).
- Site Establishment/Disestablishment was undertaken. 
- Survey set out 
- Location and protection of existing services 
- Staged traffic management which was implemented and maintained for the duration of the works 
- Single flow of traffic maintained with a large component of heavy vehicles and oversized loads needing to be accommodated for whilst works are being undertaken 
- Safety, environmental and quality management 
- Excavation and disposal of unsuitable material within lines of excavation 
- Importing of Type B Class A1 material 
- Pulverisation and insitu stablisation of existing carriage way under the MRTS07B specification 
- Supply and install of sprayed bituminous treatments 
- Installation of road furniture and road delineation undertaken once rehabilitation works were complete 
- Restoration of all disturbed areas 
 
                        