Mackay Regional Council | Pioneer River Stage 4 - North Bank Path

Client: Mackay Regional Council

Mackay Regional Council | Pioneer River Stage 4 - North Bank Path

 

The scope of works was the construction of a composite boardwalk (including structure and handrail) and the concrete shared pathway along Bruce Highway based on DTMR specifications.

 

Project Scope of Works

  • Traffic management (including notification provision to, and obtaining approvals from, any local, state and federal government and regulatory authorities).

  • Site establishment and disestablishment, quality control and compliance testing.

  • Supply and installation of the approved elevated composite boardwalk.

  • General Earthworks including stripping of Topsoil

  • Clearing and preparation of area for all works required to complete the construction including all relevant permits and approvals.

  • Concrete pathway construction including boardwalk abutments

  • Concrete lined drains and tie ins to existing services were required.

  • Supply and install road signs, hazard tactile ground indicators

  • Supply and lay turf

Special Features

  • Design & certification of boardwalk structure

Previous
Previous

Mackay Regional Council | Forbes Road Causeway Replacement

Next
Next

Pembroke Resources | Barada Barna Road Culvert Construction