DTMR | Tchanning Creek Timber Bridge Replacement
Client: Department of Transport and Main Roads
DTMR | Tchanning Creek Timber Bridge Replacement
Pentacon was the principal contractor for the replacement of Tchanning Creek Bridge, including demolition.
The project consisted of the below:
Roadworks Work Package
- Drainage, retaining structures and protective treatments; 
- Installation of culverts; 
- Clearing and grubbing; 
- Insitu stabilised pavements; 
- Sprayed bituminous treatments; 
- Road furniture; 
- Landscape and revegetation works; 
- Linemarking. 
Bridgeworks Work Package
- Erosion and sediment control; 
- Drainage, retaining structures and protective treatments; 
- General earthworks; 
- Driven steel piles; 
- Erection of prestressed concrete deck and kerb units; 
- Bridge deck; 
- Bridge barrier installation; 
- Deck wearing surface; 
 
                        