Pembroke Resources | Flood Protection Levee Works
Client: Pembroke Olive Downs Pty Ltd
Pembroke Resources | Flood Protection Levee Works
Pentacon is the principal contractor & scope of work is to construct a flood protection levee at Pembroke Olive Downs Complex.
- Site management, environmental and erosion management, safety and qualitymanagement 
- Clearing, grubbing and stockpiling of vegetation 
- Stripping of topsoil and stockpiling 
- Excavation of unsuitable material from core trench 
- Ground surface treatment under embankment, in keyway 
- Win/import, haul, place and compact levee embankment 
- Win, haul, place and trim stripped topsoil from stockpile over levee embankment 
- Grass seeding to levee embankment 
- Rock protection including placement of geotextile 
- Gravel wearing course supply and lay 
Volumes:
- Total bulk earthworks: 391,030m3 
- Total topsoil & final trim: 20,000m3 
- Total pavement capping: 6,500m3 
 
                        