Middlemount Coal | Roper Creek Diversion & Levee
Client: Middlemount Coal Pty Ltd
Middlemount Coal | Roper Creek Diversion & Levee
Pentacon was principal contractor & work scope was to construct the Roper Creek diversion and levee, and associated flood protection works.
- Ensuring works are undertaken in accordance with all MCPL and statutory safety requirements 
- Clearing and grubbing 
- Topsoil stripping and stockpiling 
- Excavation and removal of unsuitable material 
- Embankment foundation stripping 
- Key trench excavation 
- Sourcing suitable embankment fill 
- Embankment fill material placement including borrowing (excavation), moisture conditioning, haulage, placement, compaction and trimming to the specifications 
- Supply and installation of erosion protection works including rock lined channels and rock chutes 
- Sub-soil and topsoil amelioration, topsoil placement and hydromulching 
- Inspection and testing, quality assurance 
 
                        