NuGrow Western Downs | Kogan Compost Facility
Client: nugrow westerns downs pty ltd
NuGrow Western Downs | Kogan Compost Facility
The scope of works was to upgrade the compost and soil manufacturing site in stages as the Principal Contractor for NuGrow Western Downs.
Implementing environmental control measures
Detailed earthworks within the Leachate Pond and seepage detection sump
Subgrade preparation including placement and compaction of clay Liner
All materials and compaction testing of embankment and dam liner materials
Construction of water retaining embankments
Installation of leak detection sump and associated HDPE pipe work
Installation of underdrainage
Installation, welding and certification of HDPE liner
Construction of concrete sill and anchor trench
Construction of spilly way, rock chutes, and drainage channels
Construction of access road unbound pavement and road furniture
Landscaping, seeding and rehabilitation of disturbed areas
Provision of Quality Assurance Package at completion of the works
Trim Compost stockpile pad.
Install Upstream bunding and drainage to allow Leachate to flow as intended