NuGrow Western Downs | Kogan Compost Facility

Client: nugrow westerns downs pty ltd

NuGrow Western Downs | Kogan Compost Facility

 

The scope of works was to upgrade the compost and soil manufacturing site in stages as the Principal Contractor for NuGrow Western Downs.

 

  • Implementing environmental control measures

  • Detailed earthworks within the Leachate Pond and seepage detection sump

  • Subgrade preparation including placement and compaction of clay Liner

  • All materials and compaction testing of embankment and dam liner materials

  • Construction of water retaining embankments

  • Installation of leak detection sump and associated HDPE pipe work

  • Installation of underdrainage

  • Installation, welding and certification of HDPE liner

  • Construction of concrete sill and anchor trench

  • Construction of spilly way, rock chutes, and drainage channels

  • Construction of access road unbound pavement and road furniture

  • Landscaping, seeding and rehabilitation of disturbed areas

  • Provision of Quality Assurance Package at completion of the works

  • Trim Compost stockpile pad.

  • Install Upstream bunding and drainage to allow Leachate to flow as intended